A bare-board order needs more than copper artwork. Material, stack-up, holes, finish, dimensional requirements and acceptance evidence determine the manufacturing route. Use these resources to describe the finished result and resolve ambiguity before fabrication.
Start with these questions
- Does the package define one outline and one revision?
- Are finished-hole and via-treatment requirements clear?
- Which measurements and reports are required with the lot?
Read the engineering guides
Apply a tool or checklist
What to keep in the project record
Approve the fabricator’s proposed construction and record any deviations. Keep the resulting drawing, stack-up and acceptance requirements available for repeat orders.
