From bare board to assembled product.Engineering resources   /   Contact

PCB Quote File Checklist

Prepare Gerbers, drill data, BOM, pick-and-place files and test requirements for a complete PCB assembly and manufacturing quote.

One revision, one release package

Use a clearly named archive containing only the files for the requested build. Add a short manifest with the project name, revision, date and contact for engineering questions. If multiple assembly variants share one bare board, describe each variant explicitly.

Bare-board fabrication data

  • Gerber files or another manufacturing format accepted by the receiving manufacturer.
  • Plated and non-plated drill data, routed slots and a dimensioned board outline.
  • Layer order, finished thickness, material, copper requirements and surface finish.
  • Solder-mask and legend requirements, tolerances and any special features.
  • Controlled-impedance table and approved stack-up, where required.

Assembly and sourcing data

  • BOM with manufacturer part numbers, quantities, reference designators and approved alternates.
  • Pick-and-place file with units, origin, side and rotation conventions.
  • Assembly drawings showing polarity, connector orientation and do-not-populate parts.
  • Consigned-parts list, packaging condition and available quantities.
  • Programming files, firmware revision, coating and cleaning requirements.

Commercial and acceptance requirements

  • Prototype and production quantity breaks.
  • Required delivery destination and target date.
  • Inspection, electrical and functional-test requirements.
  • First-article approval, traceability and shipment records.
  • Any required qualifications that must be verified before project acceptance.

Common causes of quotation delays

Mixed revisions, missing part-number suffixes, contradictory quantities and ambiguous board outlines generate preventable questions. Review the exported package with the same discipline as the source design. If a requirement is unknown, identify it as an open question rather than leaving the manufacturer to assume.

From quote to order